There are numerous active beaver colonies along this trail. This is a fairly flat trail that wind through forests and along Tie-in Lakes. There is one major hill on heading west from Central Staging Area.
Open | |
Groomed: Jan 04 Track Set: Jan 04 | |
Length: | 3.3 km |
Type: | Connector Trail Loop |
Summer | ![]() ![]() ![]() |
Winter | ![]() |
Trail Map | Winter Trail Map Winter Trail Tear Sheet Central Staging Area Trail Map Summer Trail Map Summer Trails Pamphlet with Map Winter Trails Pamphlet with Map |
Trail Report: | Trail Report |