Trail | Length | Season | Permitted Activities (Legend) | Status |
---|---|---|---|---|
1982 Canadian Mount Everest Expedition Interpretive
May 16th: A couple small patches of snow. Downed trees removed |
2.1 km | Summer Only |
![]() |
Open |
Bill Benson
May 13th: Trail free of snow, and cleared of needles and debris. |
0.7 km one-way | Summer Only |
![]() |
Open |
Black Prince Cirque Interpretive
April 30th: Snow covered. Note: The Blackshale Creek Suspension Bridge is NOT accessed from this trail. |
4.2 km | Summer Only |
![]() |
Open |
![]() Tracks are shallow in some places. Groomed only from Elk Pass to Fox Creek. |
2.2 km one-way | Winter Only |
![]() ![]() |
Open |
Braille | 2.2 km | Winter Only |
![]() |
Open |
Burstall Pass
April 30th: Mainly deep snow. Note: Bikes permitted on first 2.9 km of trail ONLY. |
7.4 km one-way | Summer Only |
![]() ![]() |
Open |
Burstall Pass (Backcountry) | km | Winter Only |
![]() |
Open |
Chester Lake
Chester Lake: Snow covered. Annual closure in place for Chester Lake until Jun 29 to allow area to dry and prevent damage to trail. |
4.6 km one-way | Summer Only |
![]() ![]() ![]() |
Closed |
Elbow Lake
April 29th: Snowbound. Warning: No motorized or bicycle access via HWY 40, Dec 1 - Jun 20. |
1.4 km one-way | Summer Only |
![]() ![]() ![]() |
Warning |
Elk Pass
May 10th: A mix of snow and bare ground with muddy sections. Sign changeover complete. |
5.6 km | Summer Only |
![]() ![]() |
Open |
Highwood Meadows
Closed for construction Warning: No motorized or bicycle access via HWY 40, Dec 1 - Jun 20. |
0.6 km one-way | Summer Only |
![]() |
Closed |
Kananaskis Canyon Interpretive
Closed: Stream crossings washed away by penstock/dam construction. Trail is impassable and is closed indefinitely. |
0.8 km | Summer Only |
![]() |
Closed |
Lookout
April 29th: Likely a mix of bare and snow covered. Sign changeover complete. |
1.7 km | Summer Only |
![]() ![]() |
Open |
Lower Lake Interpretive
May 14th: Snow free. Blown free of needles and debris. Downed trees removed. |
0.5 km one-way | Summer Only |
![]() |
Open |
Maude-Lawson
April 29th: Deep snow. Note: This trail has been redirected just west of Forks for access to Turbine Canyon. |
7.5 km | Summer Only |
![]() |
Open |
![]() Trackset from Elkwood to the Visitor Centre on April 9th. The remainder was trackset on April 2nd. |
4.0 km | Winter Only |
![]() |
Open |
Peter Lougheed Paved
May 16th: Swept and blown free of needles and debris. A few patches of snow and ice remain on trail edges. Sign changeover complete. |
12.1 km one-way | Summer Only |
![]() ![]() |
Open |
Pocaterra
April 29th: Bare at lower elevations and partly snow covered at higher elevations. Sign changeover complete. Note: This is not the undesignated Pocaterra Ridge or Cirque route. |
9.9 km one-way | Summer Only |
![]() ![]() |
Open |
Ptarmigan Cirque Interpretive
April 29th: Snowbound Warning: No motorized or bicycle access via HWY 40, Dec 1 - Jun 20. |
4.5 km | Summer Only |
![]() |
Warning |
Rawson Lake
April 30th: Snow covered. |
3.9 km one-way | Summer Only |
![]() |
Open |
Rock Glacier Interpretive
Warning: No motorized or bicycle access via HWY 40, Dec 1 - Jun 20. |
0.15 km one-way | Summer Only |
![]() |
Warning |
Rockwall
May 16th: Blown free of needles and debris. Closed for bear activity. |
0.5 km | Summer Only |
![]() |
Closed |
Rolly Road Training Grid
Six sets of tracks set.
|
km | Winter Only |
![]() |
Open |
![]() May 14th: Swept and blown free of needles and debris. A few patches of snow and ice remain on trail edges. Sign changeover complete. |
0.8 km | Winter Only |
![]() ![]() |
Open |
![]() May 12th: Snow free between Interlakes and Point campground junction. Trail not observed beyond Point junction. Note: Bikes only permitted to Invincible Creek, 3.8 km from trailhead |
10.2 km | Summer Only |
![]() ![]() |
Open |
Upper Lake
May 12th: Snow free between Interlakes and Point campground junction. The rest of the trail has not observed this year. |
15.7 km | Summer Only |
![]() ![]() |
Open |
Whiskey Jack
May 2nd: A mix of bare and some snow patches with muddy sections. Sign changeover complete. |
3.9 km one-way | Summer Only |
![]() ![]() |
Open |
William Watson Lodge Access
May 14th: Swept and blown clean of needles and debris. Sign changeover complete. |
0.6 km one-way | Year-Round |
![]() ![]() ![]() |
Open |
Peninsula
May 16th: Snow free. Downed trees removed. |
0.4 km | Summer Only |
![]() |
Open |
Tailwater Snowshoe | 1.9 km | Winter Only |
![]() ![]() ![]() |
Open |
Frozen Toad Loop Snowshoe | 8.1 km | Winter Only |
![]() ![]() ![]() |
Open |
Torpor Loop | 6.1 km | Winter Only |
![]() ![]() ![]() ![]() ![]() |
Open |
South Sawmill Loop | 2.8 km | Winter Only |
![]() ![]() ![]() ![]() ![]() |
Open |
William Watson Lodge Connector
May 6th: Mainly snow covered. Sign changeover complete. |
0.7 km | Winter Only |
![]() ![]() ![]() ![]() ![]() |
Open |
Boulton Creek Interpretive
April 30th: Sign changeover complete. |
4.9 km | Summer Only |
![]() |
Open |
Marl Lake Interpretive
May 16th: A few patches of snow remain. Lots of needles and other small trees debris- will be blown clean when snow melts. Downed trees have been removed. |
1.5 km for loop | Summer Only |
![]() |
Open |
Lower Lake
May 14th: Mainly bare with a couple snow patches at the north end. |
3.5 km one-way | Summer Only |
![]() |
Open |
High Rockies (Winter)
Note: Between Nov. 1 and May 1 the trail is closed through the Buller Slide Path due to Highway Avalanche Control. |
63.0 km Goat Creek to Peninsula Day Use | Winter Only |
![]() ![]() ![]() ![]() ![]() |
Open |
High Rockies (Summer)
May 15th: Mainly snow covered between Sawmill to Black Prince and north of Buller. The remainder is a mix of bare with snow patches. Note: Hiker-cyclist camping allowed at select day use areas only from Jun 1 - Sep 20. See details. |
63.0 km Goat Creek to Peninsula Day Use; 80.0 km Goat Creek to Elk Pass | Summer Only |
![]() ![]() ![]() |
Open |