Effective Date: June 12, 2025
Where: Information & Facilities , Pembina River Day Use , Pembina River Provincial Park
Details: The Evansburg Trail is closed due to damaged staircases. The Old Ferry Steps Trail remains open.
The Pembina Group Use Area features two open air shelters, five small firepits and lots of maintained, grassy areas to set up tents or play sports. The area is mainly open with large trees casting some shade, and a driving loop with parallel parking is available for RVs. The site is within walking distance of the showers and flush toilets.
| Site Type | Max Units | Extra Unit | Power Sites | Power Rate | $/Night 5 Units | Reservations |
|---|---|---|---|---|---|---|
| Group Camping | 25 | $ 37 | - | - | $ 285 | Seasonal Closure |
Reservations can be made 180 days in advance of arrival date.