Permitted activities may vary within a park. Please confirm details with park staff.
Water taps are shut off in mid-September.
The lower parking lot closest to river is closed in the winter, however winter parking is available near the registration booth and by the trails on top the hill near Entwistle. Closure date depends on snowfall.
Maps & Guides
Construction MapPembina River PP, Construction, Map, Advisory -- 13700 False